Thursday, February 21, 2008
This is what 2000 feet of multi-conductor cable looks like when formed into one 100' long cable. There is a junction board on one end which will be installed in place of the old relay in the Great chamber. The other end of the cable is being fed down through an unused 10" metal wind line to the basement where the new relay system will be installed. The decision was made to remote all 4 relays (Great, Swell, Solo, & Choir) to improve access to the relays for service and in the chambers for tuning. The Great and Swell relays will be in the basement and the Choir and Solo relays will be installed in the old combination action cabinets beneath the choir stalls.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment